Documented quality at every stage

Quality Control Process for Custom Sheet Metal Enclosures

From incoming material to final crating, six full-time QA/QC specialists manage documented inspections across our 50-person sheet metal fabrication facility. Laser cutting through powder coating happens under one roof, with clear checks designed to deliver consistent parts and transparent records.

6

Full-time QA/QC personnel

100%

Final dimensional and cosmetic review

3 years

Inspection records retained

Documented quality checks for custom sheet metal enclosure production

A transparent inspection system supports dependable production and customer confidence.

The control plan

Inspection follows the work, not just the finished part

Checks are recorded as each enclosure moves through fabrication. Clear acceptance steps help catch deviations early and provide a traceable record for every job.

01 · Incoming materials

Verify before release

Coil and plate stock are checked for thickness, grade, and surface condition. Mill certificates are logged against purchase orders; lots that fail visual or dimensional criteria are rejected before production.

02 · First article

Measure against the model

The first part from each new setup is checked on a coordinate measuring machine. QC specialists compare critical dimensions—including hole positions, bend angles, and overall flatness—to the customer’s 3D model. Production proceeds only after written sign-off.

03 · Bending

Patrol bend angles

Operators check bend angles every 15 parts using digital protractors calibrated daily. QC audits readings at random and records results in the job traveler. Deviations trigger immediate machine adjustment.

04 · Welding and assembly

Inspect joints and fit-up

Weld seams receive visual checks and dye-penetrant testing where specified. Hardware stations log PEM fastener torque values, and large frames are squared on 6-meter cast-iron tables before final weld completion.

05 · Powder coating

Test adhesion and thickness

The 2500 × 6000 mm powder line uses cross-hatch adhesion pulls and dry-film thickness measurements on every batch. QC records ambient conditions, cure oven profiles, and test results. Failed adhesion means stripping and recoating before packing.

06 · Before crating

Complete a final audit

Every enclosure receives a 100% dimensional and cosmetic review. The audit checks paint coverage, hardware presence, door alignment, and gasket fit; critical areas are photographed and records retained for three years.

Traceability and reporting

Records built to support your quality system

Every job traveler connects inspection activity to the parts being produced, giving your team a clear record—not generic assurances.

Job-level traceability

Travelers list material heat numbers, inspection dates, and inspector initials.

Reports when requested

PPAP or first-article report packages can be provided within 48 hours of shipment.

Quality evidence matched to the application

Industrial equipment builders and BESS integrators receive consistent fit-up across 10- to 500-unit runs. Telecom cabinet programs benefit from documented IP-rated sealing and corrosion performance. R&D teams receive DFM feedback grounded in measured process capability.

Build with a quality process your team can verify

Share your drawings or STEP files. We review geometry, material callouts, and finish requirements, then prepare a firm quotation with lead time and quality documentation samples.

Discuss Your Project

Request a quote

Send your drawings to get started

We’ll review geometry, material callouts, and finish requirements, then return a firm quotation with lead time and quality documentation samples.